Go back to see more projects

Palmerton WWTP - Palmerton, PA

Heim Construction completed the concrete work of the Palmerton WWTP.  The project consisted of the remodeling of the existing plant.  Heim constructed a new operations building, a solids separation building with a cannibal wet-well, the reconfiguration of an existing IBR Tank to a (2) IBR Tanks, (2)EQ Tanks, (1) Influent Diversion Box & (1)Cascade Stair Tank, along with the other smaller structures.