Heim Construction completed the concrete work of the Palmerton WWTP. The project consisted of the remodeling of the existing plant. Heim constructed a new operations building, a solids separation building with a cannibal wet-well, the reconfiguration of an existing IBR Tank to a (2) IBR Tanks, (2)EQ Tanks, (1) Influent Diversion Box & (1)Cascade Stair Tank, along with the other smaller structures.