Heim Construction Co., Inc. crews working to finish slip form and concrete work on Routes SR 73 & SR 662 in Berks County
Working for the H&K Group on the PADOT project ECMS 92921 at the intersection improvements of Routes 73 & 662 in Berks County, Heim Construction crews slipped concrete curb and gutter sections, mountable curbs on the splitter islands and mountable curb at the roundabout with a truck apron curb.
Following up on the slip form work, Heim Construction crews poured the cast-in-place filler concrete at the splitter islands and poured the roundabout with a tinted concrete color utilizing the Cemstone Harvest Moon and it looks awesome.
 
 
shot-1shot-2shot-3shot-4shot-5
CONCRTE SLIP FORMING OPERATION
The slip form crew has been on the move throughout the 2019 construction season. Recently they performed work on a site with a high degree of difficulty. A challenging site with multiple locations and a final slip on a 40% grade and two radius turns.  The Heim slip team mobilized and completed the project in two days. The final 2,000 lineal feet down the grade was the most exciting. Great job guys.
 
Curb-gutter-@-west-endRoundabout-with-Cemstone-Harvest-MoonS-W-spiltter-roundaboutWest-Split,apron-mountable

Schuylkill County Bridge #200
Rehabilitation of substructure and superstructure with a compressed construction schedule.
 
ABCDE
FGHI

Wapwallopen Creek
psbidwellbridgescreed6170psbidwellbridgescreed6171psbidwellbridgescreed6177psbidwellbridgescreed6179Wapwallopen-Before
Wapwallopen-Before-CloseWapwallopen-CompletedWapwallopen-Picture
Pine Run Dam - Frackville, PA
Heim Construction teamed up with one of our clients to construct the Pine Run Dam in Frackville, Pa.  Project consisted of 1,200CY of Class AAA Concrete.
pinerundamPine-Run-Dam-1Pine-Run-Dam-2Pine-Run-Dam-3Pine-Run-Dam-4
Pine-Run-Dam-5Pine-Run-Dam-6

Roamingwood Lake Dam - Lake Aerial, PA
Heim Construction completed the concrete cut-off wall, thrust blocks, retaining wall, along with curb & sidewalks for the Roamingwood Lake Dam – Reconstruction & RCC Stabilization Project in Lake Aerial, PA
roamingwood

Palmerton WWTP - Palmerton, PA
Heim Construction completed the concrete work of the Palmerton WWTP.  The project consisted of the remodeling of existing plant.  Heim constructed a new operations building, a solids separation building with a cannibal wet-well, the reconfiguration of an existing IBR Tank to a (2) IBR Tanks, (2)EQ Tanks, (1) Influent Diversion Box & (1)Cascade Stair Tank, along with the other smaller structures.
palmertonwwtp
Heim Construction Company has performed many public works projects. Below is a list of a few public works projects we were involved with:
     
  • McAdoo Boro SR 309 ADA (Ongoing)
  • Tamaqua SR 309 Streetscape (Ongoing)
  • Elverson Boro SR 23 Slip Formed Curbs (Ongoing)
  • Schoernersville Road  SR 1009 Patches (Ongoing)
  • Summit Hill SR 902 ADA (Completed Aug 2018
  • Burger King Shamokin Dam Slip Formed Curbs (Completed July 2018)
  • Burger King Shamokin Slip Formed Curbs (Completed July 2018)
  • St. Anthony Street Lewisberg ADA (Completed July 2018)
  • State Street Harrisburg Slip Formed (Curbs (Completed June 2018)
  • St. Lukes Hospital Electrical Trench (Completed May 2018)
  • Ephrata Boro SR 272 ADA (Completed Sep 2017)
  • Shillington & Wyomissing Boro’s ADA (Completed Aug 2017)
  • Schuylkill County SR 1017 ADA (Completed Aug 2017)
  • Mack Blvd. Allentown ADA (Completed June 2017)
  • Freeland Streetscape Phase II (Completed May 2017)
  • Reading SR 2039 ADA (Completed March 2017)